You can help expand this article with text translated from the corresponding article in French. (July 2023) Click [show] for important translation instructions.
Machine translation, like DeepL or Google Translate, is a useful starting point for translations, but translators must revise errors as necessary and confirm that the translation is accurate, rather than simply copy-pasting machine-translated text into the English Wikipedia.
Do not translate text that appears unreliable or low-quality. If possible, verify the text with references provided in the foreign-language article.
You must provide copyright attribution in the edit summary accompanying your translation by providing an interlanguage link to the source of your translation. A model attribution edit summary is Content in this edit is translated from the existing French Wikipedia article at [[:fr:Autoroute A51 (France)]]; see its history for attribution.
You may also add the template {{Translated|fr|Autoroute A51 (France)}} to the talk page.
Its main section connects Marseille to Aix-en-Provence and the Durance Valley to the north of Sisteron (Saulce). Only 18 km is toll free between Marseilles and Aix-en-Provence, the remaining 128 km is a toll road operated by Escota between Aix-en-Provence and Saulce. At Aix-en-Provence, the autoroute becomes briefly the N296 dual-carriageway between the exits Jas-de-Boufan and Aix-les-Platanes. This section where it meets the N7 was originally proposed to be an autoroute but building has subsequently compromised the route. There is a speed limit of 50 km/h on part of the N296.
A section at the Grenoble end, Varces to Coynelle (17 km), was opened in July 1999. This was extended in March 2007 when the next section, connecting Coynelle to the Col du Fau (10.5 km), was opened in March 2007. This includes 4.5 km which is a single carriageway through the Tunnel of Sinard and over the Viaduct de Monestier. This northern section is also a toll road but it is operated by AREA. This has greatly reduced the summer congestion through the commune of Monestier.
This article contains a bulleted list or table of intersections which should be presented in a properly formatted junction table. Please consult this guideline for information on how to create one. Please improve this article if you can.(December 2021)
11 (St-Paul de Varces) Towns served: St-Paul de Varces, Le Gua
10 (Varces) Towns served: Varces
Exchange A51-A480 Junction with the A480 to Grenoble, Chambéry and Lyon.
History
The first section was built in 1953, it connected the Autoroute de nord (open in 1951) to Cabriès. It was only extended to Aix-en-Provence and the A8 in 1970. The construction of the section from Grenoble to Sisteron was subject to protests because of its environmental impact. In 1995 for example, demonstrators blocked work by chaining themselves to construction equipment.
Future
Following many ministerial and policy changes, and tensions between local residents. As a result, the completion of the motorway has been on the agenda for 20 years.
Were all the sections are completed the road journey from Grenoble-Marseille would be 2h40 (instead of the current 3h30). However, there are several problems:
The design of the road
The class of roads (toll/free autoroute, expressway or upgrade of the current roads (N75 and N85)
The cost of the project.
Strong environmental impact of the route.
The motorway must pass through the middle of the South-Dauphiné (Trièves) Alps. There were two options for the route between the Col de Fau (Monestier-de-Clermont) and the end of the southern section near Gap:
The "High Route" was the most direct route over several high passes to Sisteron (The budget at the time was envisaged at 1.8 billion euros)
"Gap East" (via the Drac valley, the Col de Bayard and the Avance valley) to Saulce the current end of the motorway from Marseille (the budget was envisaged to be approximately 2.2 billion euros).
Following a public inquiry organized between 2005 and 2006, the Minister Mr Perben announced in 2006 that A51 would be built on the Gap East route. However the 2011 edition of the National Scheme of Transport Infrastructure (SNIT) did not include the completion of this section. Completion before 2025 is unlikely.
External links
Wikimedia Commons has media related to A51 autoroute.