Pagidipalli–Nallapadu section
The Pagidipalli–Guntur section[1] is an electrified single track railway section in Guntur railway division of South Central Railway.[2][3] HistoryThe Guntur–Macherla section was opened in 1930. A new railway line from Bibinagar to Nadikudi was started in 1974, and foundation stone was laid by then-Prime Minister of India Indira Gandhi on 7 April 1974. It opened for traffic in 1989 there by making connectivity between Guntur Junction and Secunderabad Junction.[4] In 2023, the Centre cleared the doubling of Guntur-Bibinagar railway. The long-pending project is estimated to cost 2,853 crore and will be monitored by the Prime Minister's Office.[5][6] RouteThis route starts from Pagidipalli (near Bibinagar) and passes through Nalgonda, Miryalaguda, Nadikudi, Piduguralla, Sattenapalle and joins Nallapadu near Guntur.[2] References
|