Secunderabad–Bolarum route
The Secunderabad–Bolarum (abbr. SB) is a suburban rail service of the Multi-Modal Transport System of Hyderabad, India.[1] Spanning 11 stations, it runs between Secunderabad and Bolarum 5 times a day.[2] HistoryThe Secunderabad–Bolarum route is one of the oldest suburban rail in the city of Hyderabad, established by Nizam's Guaranteed State Railway. Initially, it was a metre-gauge track but was later converted into broad-gauge.[2] Stations
MMTS routeSecunderabad–Bolarum route is scheduled to take off as a part of the phase 2 of the Hyderabad Multi-Modal Transport System in December 2018., however was delayed due to paucity of funds.[3][4] The work of the section is nearing to completion in February 2020.[5].Finally, 13 MMTS Services along 2 routes under the MMTS phase 2 was inaugurated on 8th april 2023 on Secunderabad medchal & Falaknuma Umdanagar routes by PM Narendra Modi.[6] ElectrificationRailway electrification system of the 13 km long route was completed in 2018 by South Central Railway.[7] Image gallery
References
External links |