Solar power in Gujarat
Overview of solar power in Gujarat
Solar power in Gujarat , a state of India, is a fast developing industry given that the large state is mostly arid. It was one of the first states to develop solar generation capacity in India .
As June 2024, total installed solar power generation capacity of the state was 14,182 MW.[ 1]
State solar policy
As of 30 June 2022, Gujarat has an installed capacity of 19,414 MW of renewable energy, and includes 9419.42 MW of wind power, 7806.80 MW of solar power, 1990 MW of large hydro power, 109.26 MW of bio power and 89.39 MW from small hydro power.[ 2]
Under the Scheme for Development of solar parks and Ultra-mega Solar Power Projects is underway with a target of setting up to 40,000 MW of Solar capacity.[ 2]
In addition to the existing solar power policy, the state has also come out with a solar-wind hybrid policy, looking to establish four-five such parks with at least 2000 MW capacity.[ 3]
Total installed solar power generation capacity of the state increased from 4,431 MW in March 2021[ 4] to 7,180 MW in March 2022.[ 5]
Rooftop solar
Total rooftop solar power installation capacity of state is 3455.90 MW, as of April 2024.[ 6] Gujarat is a top performing state in India in respect to rooftop solar.[ 7]
Location of Solar parks
Solar power plants across the state [ 8] [ 9]
Location
District
Site co-ordinates
Nominal Power (MWp )
Production (Annual GW·h )
Developer
Notes
Rajuvadia
Narmada
R8FQ+34, Rajuvadia, Gujarat 393120
16
-
Bhaarat spinning mills solar park
Bhersam
Bharuch
21°46′12.5″N 72°50′26.0″E / 21.770139°N 72.840556°E / 21.770139; 72.840556
6
-
KPI Green Energy
Khavda
Kachchh
24°02′15.1″N 69°32′28.6″E / 24.037528°N 69.541278°E / 24.037528; 69.541278
240
-
KPI Green Energy
Ora
Bharuch
21°51′23.2″N 72°53′18.1″E / 21.856444°N 72.888361°E / 21.856444; 72.888361
30
-
KPI Green Energy
Ochhan
Bharuch
21°59′14.7″N 73°02′00.5″E / 21.987417°N 73.033472°E / 21.987417; 73.033472
17
-
KPI Green Energy
Sarod
Bharuch
22°09′49.7″N 72°44′39.0″E / 22.163806°N 72.744167°E / 22.163806; 72.744167
16
-
KPI Green Energy
Samoj
Bharuch
22°09′06.8″N 72°43′41.4″E / 22.151889°N 72.728167°E / 22.151889; 72.728167
56
-
KPI Green Energy
Shahpura
Bharuch
21°52′28.2″N 73°06′32.0″E / 21.874500°N 73.108889°E / 21.874500; 73.108889
19.8
-
KPI Green Energy
Bhensali
Bharuch
21°43′13.6″N 72°44′46.9″E / 21.720444°N 72.746361°E / 21.720444; 72.746361
5.2
-
KPI Green Energy
Jhanor
Bharuch
21°50′8.8″N 73°07′01.6″E / 21.835778°N 73.117111°E / 21.835778; 73.117111
2.7
-
KPI Green Energy
Tanchha
Bharuch
21°53′50.9″N 72°54′11.3″E / 21.897472°N 72.903139°E / 21.897472; 72.903139
17
-
KPI Green Energy
Vagra
Bharuch
21°50′16.3″N 72°50′34.7″E / 21.837861°N 72.842972°E / 21.837861; 72.842972
10.5
-
KPI Green Energy
Muler
Bharuch
21°52′23.5″N 72°40′49.5″E / 21.873194°N 72.680417°E / 21.873194; 72.680417
9.9
-
KPI Green Energy
Kurchan
Bharuch
21°54′23.8″N 72°57′53.0″E / 21.906611°N 72.964722°E / 21.906611; 72.964722
18
-
KPI Green Energy
Vedcha
Bharuch
22°00′32.7″N 72°56′32.2″E / 22.009083°N 72.942278°E / 22.009083; 72.942278
21.5
-
KPI Green Energy
Sudi
Bharuch
21°53′30″N 72°53′55″E / 21.89167°N 72.89861°E / 21.89167; 72.89861
100
-
KPI Green Energy
Jafrabad
Amreli
20°52′34″N 71°16′57″E / 20.87611°N 71.28250°E / 20.87611; 71.28250 (Jafrabad Solar Park )
5
8.322
Sunkon Energy
[ 10]
Wadgam
Anand
22°19′12″N 72°25′48″E / 22.32000°N 72.43000°E / 22.32000; 72.43000 (Wadgam Solar Park )
15
25.846
Acme Tele Power
Isanpur
Anand
22°28′51″N 72°31′25″E / 22.48083°N 72.52361°E / 22.48083; 72.52361 (Isanpur Solar Park )
1
1.533
Harsha Engineers
Gunthawada[ 11] [ 12] [ 13] [ 14]
Banaskantha
23°55′07″N 71°56′28″E / 23.91861°N 71.94111°E / 23.91861; 71.94111 (Precious Solar Park ) [ 15]
15.2
26.28
Precious (Moser Baer )
Commissioned 11 October 2011
Gunthawada[ 11] [ 12] [ 13] [ 14]
Banaskantha
23°54′40″N 71°55′52″E / 23.91111°N 71.93111°E / 23.91111; 71.93111 (Solitaire Solar Park ) [ 15]
15
25.9
Solitaire (Moser Baer )
Commissioned 11 October 2011, with Precious cost Rs 465 crore, area 305 acre, 236,000 Thin Film modules[ 16]
Dhanera
Banaskantha
24°31′27″N 72°12′12″E / 24.52417°N 72.20333°E / 24.52417; 72.20333 (Dhanera Solar Park )
25
45.377
Sand Land Real Estate
Bharuch
1
MBH Power
Gandhinagar
1
GSEC-TPS
Gandhinagar
1
PDPU-GPCL-GEDA
250 kW from Thin-Film, 750 kW from Poly-crystalline solar cells.
Mithapur
Jamnagar
22°36′N 72°07′E / 22.600°N 72.117°E / 22.600; 72.117 (Mithapur Solar Power Plant )
25.0
Tata Power
Commissioned 25 January 2012
Shiloj
Junagadh
22°49′09″N 71°00′32″E / 22.81917°N 71.00889°E / 22.81917; 71.00889 (Mithapur Solar Power Plant ) [ 17]
10
19.585
Mono Steel Solar
Output decreases 0.7%/year from 20 GWh
Bitta [ 18]
Kutch
23°15′46″N 69°01′27″E / 23.26278°N 69.02417°E / 23.26278; 69.02417 (Bitta Solar Park ) [ 19]
40.0
66.576
Adani Power
Completed January 2012 using 400,000 modules.[ 20] Completed in 150 days at a cost of Rs 400 crore.[ 21] (6760 million INR) 100 MW planned
Shivlakha
Kutch
5
Backbone
Bhuj
Kutch
1
Essar Power
Panandhro
Kutch
5
GMDC
Pratapgarh
Kutch
23°21′59″N 70°44′41″E / 23.36639°N 70.74472°E / 23.36639; 70.74472 (Pratapgarh Solar Park ) [ 22]
9
13.451
Integrated Coal Mining (ICML)
0.5 MW Amorphous Si, 0.5 MW CdTe, 8 MW Crystalline Si
Shivlakha
Kutch
23°21′54″N 70°37′26″E / 23.36500°N 70.62389°E / 23.36500; 70.62389 (Konark Solar Park ) [ 23]
5
8.87
Konark Gujarat
Vikram Solar
Shivlakha
Kutch
23°19′28″N 70°24′01″E / 23.32444°N 70.40028°E / 23.32444; 70.40028 (Shivlakha Solar Park ) [ 24]
20
30.835
Solar Semiconductor
Karmaria
Kutch
23°12′34″N 70°13′56″E / 23.20944°N 70.23222°E / 23.20944; 70.23222 (Karmaria Solar Park ) [ 25]
15.401
21.108
Sun Borne
Solar World SW-230, cost 2102 million Rs, output is derated 1%/year
Khirsara
Kutch
23°21′32″N 70°03′14″E / 23.35889°N 70.05389°E / 23.35889; 70.05389 (Khirsara Solar Park ) [ 26]
5
8.147
Unity Power
SF-145-L 145Wp Copper Indium Selenide
Khirsara
Kutch
23°21′37″N 70°03′15″E / 23.36028°N 70.05417°E / 23.36028; 70.05417 (Welspun Solar Park )
15
Welspun Urja Gujarat
Narmada Canal - Chandrasan
Mehsana
1
GSEC-Canal
Charanka
Patan
213.9
Consists of 31 projects
Commissioned 19 April 2012
Patan
5
Jaihind Projects
Bhadrada
Patan
23°40′57″N 71°46′30″E / 23.68250°N 71.77500°E / 23.68250; 71.77500 (Bhadrada Solar Park )
5.001
7.963
Lanco Solar
21,740 230 Wp Poly Si panels
Chadiyana
Patan
23°41′32″N 71°34′01″E / 23.69222°N 71.56694°E / 23.69222; 71.56694 (Chadiyana Solar Park )
15
23.955
Lanco Solar
5 MW from 20,647 230W Poly Silicon and 2,464 102W thin film; 10 MW from multi crystalline Si 230W and 235W panels[ 27]
Dahisar
Patan
20
PLG Photovoltaic
Hilabeli
Porbandar
21°57′24″N 71°19′44″E / 21.95667°N 71.32889°E / 21.95667; 71.32889 (Hilabeli Solar Park )
10
17
GHI Energy
fixed tilt mounted at 20° angle[ 28]
Kerala & Bapodar
Porbandar
21°37′39″N 69°49′57″E / 21.62750°N 69.83250°E / 21.62750; 69.83250 (Kerala & Bapodar Solar Park ) [ 29]
20
35.425
Hiraco Renewable Energy
Bapodar
Porbandar
21°37′39″N 69°49′57″E / 21.62750°N 69.83250°E / 21.62750; 69.83250 (Bapodar Solar Park )
15
27.265
Moser Baer
125,100 80W First Solar and 13,490 370W MBSL panels, 18 880 kW Sunny Central SMA-800 inverters
Dhank
Rajkot
21°46′17″N 70°05′04″E / 21.77139°N 70.08444°E / 21.77139; 70.08444 (APCA Power Solar Park )
5
8.699
APCA Power
Dhank
Rajkot
21°46′35″N 70°04′47″E / 21.77639°N 70.07972°E / 21.77639; 70.07972 (Aravali Solar Park ) [ 30]
5
8.02
Aravali Infrapower
Dhank
Rajkot
21°43′56″N 70°06′07″E / 21.73222°N 70.10194°E / 21.73222; 70.10194 (Dhank Solar Park ) [ 31]
10
17.678
CBC Solar
Dhank
Rajkot
21°43′56″N 70°06′07″E / 21.73222°N 70.10194°E / 21.73222; 70.10194 (Ganeshvani Solar Park ) [ 32]
5
8.839
Ganeshvani Merchandise
Mervadar and Dhank
Rajkot
21°43′56″N 70°06′07″E / 21.73222°N 70.10194°E / 21.73222; 70.10194 (Ganges Solar Park )
15
Ganges Entertainment
Mervadar
Rajkot
21°44′11″N 70°07′12″E / 21.73639°N 70.12000°E / 21.73639; 70.12000 (Mervadar Solar Park ) [ 33]
10
17.835
GreenInfra[ 34]
Cost Rs 130 crore, First Solar thin film
Bhatkota
Sabarkantha
23°33′35″N 73°17′08″E / 23.55972°N 73.28556°E / 23.55972; 73.28556 (Abellon Solar Park )
3
Abellon Cleanenergy
Constructed by Waaree Energies Ltd.
Khadoda
Sabarkantha
22°52′39″N 72°04′13″E / 22.87750°N 72.07028°E / 22.87750; 72.07028 (Khadoda Solar Park )
10.2
Azure Power (Haryana)
Nani Naroli
Surat
21°25′20″N 73°07′30″E / 21.42222°N 73.12500°E / 21.42222; 73.12500 (Nani Naroli Solar Park )
5
7.53
GIPCL
Dhama
Surendranagar
23°12′N 71°24′E / 23.200°N 71.400°E / 23.200; 71.400 (Dhama Solar Park )
5
8.537
Azure Power
Fatepur
Surendranagar
23°23′57″N 71°38′20″E / 23.39917°N 71.63889°E / 23.39917; 71.63889 (Fatepur Solar Park )
5
8
EMCO
output declines 0.7%/year
Fatepur
Surendranagar
23°25′05″N 71°37′20″E / 23.41806°N 71.62222°E / 23.41806; 71.62222 (Mi My Solar Park )
15
24.873
Mi My
[ 35]
Dhama
Surendranagar
23°24′N 71°42′E / 23.400°N 71.700°E / 23.400; 71.700 (Dhama Solar Park )
5
Environmental System
Sujangadh
Surendranagar
22°43′35.77″N 71°25′58.16″E / 22.7266028°N 71.4328222°E / 22.7266028; 71.4328222 (Sujangadh Solar Park )
25
Louroux Bio Energies
Dhama
Surendranagar
23°30′N 71°42′E / 23.500°N 71.700°E / 23.500; 71.700 (Dhama Solar Park )
9.27
20.498
Millennium Synergy
output declines 0.5%/year
Patdi
Surendranagar
23°09′N 71°45′E / 23.150°N 71.750°E / 23.150; 71.750 (Patdi Solar Park )
1
1.815
Rajesh Power Services
Patdi
Surendranagar
1
Rasna Marketing Services
Surendranagar
1
Som Shiva
Surel
Surendranagar
23°28′12″N 71°35′06″E / 23.47000°N 71.58500°E / 23.47000; 71.58500 (Surel Solar Park )
25
35.41
Visual Percept Solar Projects
Commissioned 31 December 2011, cost 138 million INR/MW
Tikar[ 36]
Surendranagar
23°09′N 71°06′E / 23.150°N 71.100°E / 23.150; 71.100 (Tikar Solar Park )
10.22
16.82
Waa Solar (Madhav Power)
First Solar Thin Film CdTe Solar Modules, Commissioned December 2011
Total
702.30[ 37] [ 38] [ 39]
1095 (est)
Solar Power Generation Report Statewide
Generation report
Month
Power (MWp )
Production (MW·h )
kWh/kWp/day (hrs/day)
Notes
2010-12
5
363.746
Lanco
2010
5
363.746
2011-01
5
657.910
2011-02
5
689.590
2011-03
5
847.320
2011-04
5
776.140
2011-05
5
639.800
2011-06
10
844.350
Azure added
2011-07
10
1,053.002
2011-08
10
848.378
2011-09
10
1,078.100
2011-10
40
4,144.470
Solitaire and Precious added (Moser Baer)
2011-11
120
8,774.701
Welspun Urja, Green Infra, Azure, ESP, Visual, Millenium, and Emco added
2011-12
160
16,687.297
Adani Power added
2011
160
37,041.058
2012-01
234
23,392.344
Sun Edison, Konark, Backbone, Mithapur, GHI, Patdi, and MBH solar added
2012-02
280
35,606.103
4.31
GIPCL, Kanyabe, Louroux, and Charanka added hrs/day=4.80 if the 40 MW not operating the full month is excluded
2012-03
521
71,181.352
4.95
Aravali infra, ICML, Waa Solar, PLG, Charanka expanded, Jaihind, ACME Solar, Harsha, PDPU, Abellon Cleanenergy, and Universal Solar added
2012-04
604.89
86,191.200
4.75
Mono Steel and Solar Semi added
2012-05
669.4
93,300.790
4.50
Moser Baer, Sunkon, and Hiraco added; Rasana, Rajesh, MBH solar, Essar, Sun Edison, Harsha, PDPU, Abellon, and Universal Solar consolidated into others or not reported
2012-06
689.81
85,207.413
4.14
SunBorne added
2012-07
690.4
63,348.654
2.96
2012-08
690.4
58,642.394
2.74
2012-09
690.4
71,719.094
3.46
2012-10
690.4
97,507.692
4.56
2012-11
695.4
89,028.179
4.27
APCA added
2012-12
702.3
91,649.723
4.21
Astonfield, Euro, S J Green Park, Chattel Construction, and Aatash Power added
2012
702.3
867,715.627
2013-01
823.9
108,706.728
4.26
Mi My, Responsive added
2013-02
823.9
108,077.418
4.68
2013-03
856.81
127,788.259
4.81
2013-04
886.81
123,634.094
4.81
Taxus, Ujjwala added
2013-05
856.81
128,752.498
4.85
2013-06
856.81
97,134.946
3.78
2013-07
856.81
70,479.155
2.65
2013-08
856.81
82,548.478
3.11
2013-09
856.81
95,634.111
3.60
2013-10
856.81
109,534.793
4.12
2013-11
856.81
104,635.154
3.94
2013-12
856.81
110,720.494
4.17
2013
856.81
1,267,646.129
2014-01
856.81
110,757.896
4.17
2014-02
856.81
108,807.058
4.10
2014-03
862.81
132,374.487
4.95
Jaydeep Cotton added
2014-04
862.81
132,404.605
4.95
2014-05
862.81
130,853.363
4.89
2014-06
862.81
112,480.673
4.21
2014-07
862.81
89,505.624
3.35
2014-08
862.81
93,690.516
3.50
2014-09
1000.05
99,140.672
3.20
BEL, EPPL added
2014-10
1000.05
114,841.173
3.70
2014-11
1000.05
106,945.300
3.45
2014-12
1000.05
115,440.984
3.72
2014
1000.05
1,347,242.350
2015-01
1000.05
119,867.775
3.87
2015-02
1000.05
122,643.366
3.96
2015-03
1000.05
142,227.550
4.59
2015-04
1000.05
142,812.131
4.61
2015-05
1000.05
151,267.431
4.88
2015-06
1000.05
119,395.042
3.85
2015-07
1000.05
91,133.021
2.94
2015-08
1000.05
97,582.518
3.15
2015-09
1000.05
123,211.648
3.97
2015-10
1000.05
141,661.937
4.57
2015-11
1000.05
119,838.276
3.87
2015-12
1000.05
130,560.415
4.21
2015
1000.05
1,502,201.110
2016-01
1024.15
139,319.531
4.39
Rallies added
Total
5,161,529.551
Source: SLDC Gujarat[ 40]
2011 Generation detail
Generation detail (MW·h )
January
February
March
April
May
June
July
August
September
October
November
December
Total
Lanco
657.910
689.590
847.320
776.140
639.800
514.800
551.900
471.200
568.100
929.090
1,773.710
2,135.960
10,555.520
Azure Power
329.550
501.102
377.178
510.000
1,060.180
1,550.400
1,664.400
5,992.810
Solitaire
1,018.600
1,879.000
2,059.200
4,956.800
Precious
1,136.600
1,644.800
1,921.200
4,702.600
Welspun Urja
1,054.600
2,013.300
3,067.900
Green infra
819.500
1,313.400
2,132.900
Azure, ESP, Visual, Millenium, Emco
52.691
4,284.809
4,337.500
Adani Power
1,295.028
1,295.028
Total
657.910
689.590
847.320
776.140
639.800
844.350
1,053.002
848.378
1,078.100
4,144.470
8,774.701
16,687.297
37,041.058
2012 Generation detail
Generation detail (MW·h )
January
February
March
April
May
June
July
August
September
October
November
December
Total
Lanco
2,596.660
2,596.340
2,516.950
2,281.050
2,176.470
1,962.510
1,471.960
1,268.850
1,846.360
2,619.510
2,379.280
2,563.480
26,279.420
Solitaire
1,983.200
2,189.200
2,365.000
2,385.400
2,373.000
1,860.200
1,428.800
1,252.000
1,637.600
2,238.600
2,059.200
2,068.000
23,840.200
Precious
1,888.200
2,006.200
2,349.200
2,397.400
2,398.600
1,983.400
1,490.800
1,326.400
1,708.800
2,340.800
2,080.400
2,113.400
24,083.600
Azure Power
1,722.000
1,742.000
1,848.000
1,601.800
1,622.000
1,317.000
944.400
829.400
1,040.800
1,670.000
1,599.800
1,697.800
17,635.000
Sun Edison
1.320
10.600
102.980
149.420
264.320
Welspun Urja
2,096.300
2,489.900
3,034.500
3,050.900
3,188.972
2,911.465
2,255.990
2,171.306
2,436.420
3,320.359
2,917.886
2,956.633
32,830.631
Green infra
1,405.400
1,481.800
1,704.700
1,701.900
1,682.100
1,441.600
1,110.100
971.300
1,180.200
1,592.900
1,355.100
1,326.200
16,953.300
Aravali infra
427.800
573.100
69.900
0.000
297.000
322.600
341.000
431.400
630.600
623.900
649.900
4,367.200
Mono Steel
1,557.183
1,885.503
1,500.318
1,338.950
1,056.212
1,259.749
1,633.977
1,670.961
1,660.436
13,563.289
Azure, ESP, Visual, Millenium, Emco
4,126.000
6,302.000
7,232.000
7,214.000
7,594.000
6,414.000
4,398.000
4,082.000
5,267.736
7,008.000
6,528.000
7,866.000
74,031.736
Adani Power
4,607.640
5,687.388
6,657.102
6,605.460
6,683.436
4,890.078
3,856.392
3,756.816
4,211.694
6,287.148
5,343.984
5,291.172
63,878.310
Konark
453.460
902.680
926.800
915.060
941.920
781.940
563.760
500.750
628.360
825.570
766.499
780.832
8,987.631
Backbone
504.225
580.050
829.050
879.300
1,085.400
659.700
561.600
451.650
599.115
776.850
635.400
602.790
8,165.130
ICML
1,228.095
1,352.313
1,340.190
1,205.289
896.436
848.817
1,022.130
1,116.200
1,227.105
1,265.706
11,502.281
Solar Semi
1.003
1,124.337
1,450.400
2,094.500
2,215.000
2,521.250
3,267.000
2,795.000
2,761.000
18,229.490
SunBorne
2,233.700
3,248.100
1,432.200
1,531.900
2,258.700
2,255.000
2,237.700
15,197.300
TATA (Mithapur)
845.973
3,937.725
4,259.303
3,693.544
4,137.313
3,488.215
2,766.184
2,611.696
3,087.262
4,023.187
3,662.223
3,651.992
40,164.615
GHI
1,150.860
1,603.300
1,735.700
1,648.400
1,572.200
1,305.400
988.600
907.100
788.300
1,355.700
1,410.300
1,478.200
15,944.060
Moser Baer
2,476.327
1,964.846
1,613.092
1,578.320
1,185.669
2,327.351
2,170.408
2,211.727
15,527.739
Hiraco
3,013.224
2,094.320
1,524.580
1,377.873
2,024.915
3,011.783
2,822.013
2,944.690
18,813.399
Rasana
0.202
287.300
296.480
260.990
844.972
Rajesh
135.550
155.470
128.540
419.560
MBH
10.904
95.644
87.709
67.065
261.322
GIPCL
794.808
731.484
677.628
630.990
596.592
418.536
409.626
421.182
427.950
730.944
702.432
6,542.172
Essar
90.703
152.447
150.693
393.843
Louroux
1,322.750
2,125.200
3,870.000
4,115.400
3,580.660
2,608.940
2,499.260
2,985.780
3,204.400
2,717.280
2,640.280
31,669.950
Waa Solar
1,880.000
1816.000
1,829.000
1,505.000
1,132.000
1,085.000
1,335.000
1,661.000
1,510.000
1,497.000
15,250.000
PLG
2,836.000
2,926.800
3,191.300
2,684.900
2,006.100
1,818.600
2,135.300
3,019.400
2,788.300
2,875.100
26,281.800
Thavar
560.496
3,035.170
3,597.010
3,507.550
2,665.090
2,441.580
2,804.940
3,813.250
3,314.760
3,451.260
29,191.106
Charanka Solar Park
922.366
21,866.910
31,621.590
31,497.000
30,249.000
19,250.000
19,125.000
24,758.000
33,242.000
30,150.000
30,565.000
273,246.866
Jai Hind
401.790
693.910
562.640
491.090
411.880
354.840
564.270
804.050
615.090
608.990
5,508.550
ACME
1346.800
2,385.000
2,432.800
2,157.800
1,487.200
1,425.600
1,675.400
2,227.400
2,119.200
2,085.400
19,342.600
Sunkon
149.658
673.440
494.064
504.198
629.562
804.006
764.250
893.436
4,912.614
Harsha
440.460
156.040
596.500
PDPU
161.850
150.465
312.315
Abellon Cleanenergy
440.540
449.110
889.650
Universal Solar
335.237
298.173
633.410
APCA
15.896
203.167
219.063
Astonfield
264.190
264.190
Euro
221.547
221.547
S J Green
358.800
358.800
Chattel
27.264
27.264
Aatash
68.892
68.892
Total
23,392.344
35,606.103
71,181.352
86,191.200
93,300.790
85,207.413
63,348.654
58,642.394
71,719.094
97,507.692
89,028.179
91,649.723
867,715.627
2013 Generation detail
Generation detail (MW·h )
January
February
March
April
May
June
July
August
September
October
November
December
Total
Lanco
2,853
2,672
3,039
1,890
2,251
2,135
1,561
1,868
2,112
2,523
2,350
2,376
27,633
Jai Hind
693
678
820
762
741
573
375
426
527
553
646
589
7,389
Astonfield
1,086
1,486
1,869
1,650
1,920
1,039
952
1,153
1,302
1,414
1,218
1,231
16,329
Precious
2,257
2,075
2,597
2,454
2,513
1,935
1,390
1,098
2,254
2,202
2,035
2,114
24,935
Solitaire
2,210
2,053
2,534
2,392
2,379
1,865
1,381
1,555
1,834
2,132
1,988
2,082
24,421
Azure Power Khadoda
1,743
1,604
1,843
1,739
1,862
1,198
765
914
1,158
1,497
1,537
1,554
17,432
Aatash
691
680
801
770
657
615
290
335
530
698
698
702
7,488
Green Infra
1,469
1,461
1,737
1,647
1,644
1,202
874
1,114
1,266
1,427
1,400
1,429
16,693
Aravali Infra
653
707
801
764
701
506
371
449
312
601
563
305
6,759
Mono Steel
1,798
1,691
1,880
1,833
1,921
1,281
951
1,150
1,270
1,515
1,558
1,677
18,554
Welspun Urja
2,981
2,984
3,566
3,384
3,518
2,764
2,025
2,461
2,874
3,134
2,902
3,016
35,642
Taxus
638
774
550
361
386
503
436
364
376
4,425
Adani Power
5,370
5,511
6,619
6,324
6,520
5,126
3,607
4,080
5,134
5,346
4,821
4,888
63,386
Konark
844
800
945
895
936
761
537
648
730
847
814
858
9,658
Backbone
660
664
906
966
1,077
842
508
603
710
748
632
633
8,993
ICML
1,355
1,278
1,461
1,392
1,413
1,148
791
974
1,113
1,265
1,221
1,293
14,752
Solar Semi
2,843
2,798
3,328
3,166
3,318
2,716
1,748
2,166
2,291
2,640
2,578
2,723
32,366
SunBorne
2,431
2,256
2,373
1,624
2,064
1,968
1,414
1,657
1,740
2,162
2,182
2,360
24,285
Euro
796
714
843
779
827
671
477
559
620
694
672
723
8,430
TATA (Mithapur)
3,940
3,739
4,328
4,110
4,239
3,283
2,561
2,846
3,275
3,851
3,748
3,747
43,727
GHI
1,592
1,522
1,766
1,596
1,636
969
717
993
1,171
1,335
1,326
1,491
16,177
Moser Baer
2,330
2,249
2,625
2,453
2,438
1,613
1,303
1,631
1,846
2,084
2,098
2,181
24,916
Hiraco
3,127
2,880
3,426
3,155
3,162
2,216
1,554
2,100
2,428
2,733
2,791
3,030
32,671
APCA
384
550
689
658
771
554
395
497
523
665
685
723
7,166
GIPCL
790
696
618
793
800
474
298
498
475
617
661
708
7,503
Mi My Solar
4,025
4,495
5,334
4,976
4,625
3,854
2,527
3,517
4,238
4,506
4,178
4,389
50,743
EMCO
759
721
845
784
768
590
429
549
589
697
647
664
8,122
Azure Power Dhama
731
704
843
805
787
624
435
557
511
440
313
660
7,494
ESP
759
747
913
894
870
702
498
608
575
784
689
708
8,835
Millenium
1,700
1,609
1,922
1,842
1,936
1,476
905
1,179
1,155
1,645
1,549
1,623
18,630
Visual
3,687
3,403
3,951
3,650
3,630
2,887
2,159
2,676
2,617
3,483
3,207
3,401
38,844
Chattel
1,824
3,274
4,003
3,663
3,929
3,022
2,116
2,221
2,761
3,376
3,144
3,541
36,970
Responsive
2,246
3,304
4,004
3,800
3,858
2,470
1,572
2,052
2,332
2,700
3,152
3,418
35,007
Ujjwala
1,684
2,780
2,090
1,538
1,640
1,960
2,580
2,446
3,324
20,144
Louroux
3,044
3,077
3,699
3,526
3,495
2,534
1,885
2,291
2,306
2,587
2,616
2,696
33,860
Waa Solar
1,620
1,564
1,869
1,777
1,818
1,376
982
1,203
1,295
1,505
1,461
1,503
16,174
S J Green
543
731
903
698
780
623
455
575
619
721
722
753
10,141
PLG
3,062
2,899
3,408
3,181
3,204
2,462
1,840
1,408
1,893
1,760
2,116
2,595
29,941
Thavar
3,611
3,681
4,337
4,212
4,250
3,262
2,616
2,697
2,981
3,782
3,381
3,454
42,381
Charanka Solar Park
32,397
30,486
36,087
36,236
37,977
28,328
21,456
24,713
28,812
32,388
30,247
31,767
371,014
ACME
2,167
2,088
2,436
2,324
2,288
1,706
1,044
1,426
1,794
2,000
1,829
1,895
23,248
Sunkon
1,637
1,548
1,825
1,748
1,674
1,127
817
1,075
1,200
1,459
1,450
1,521
17,209
Total
108,707
108,077
127,788
123,634
128,752
97,135
70,479
82,548
95,634
109,535
104,635
110,720
1,267,646
2014 Generation detail
Generation detail (MW·h )
January
February
March
April
May
June
July
August
September
October
November
December
Total
Lanco
2,436
2,417
2,845
2,855
2,754
2,225
1,811
1,900
2,030
2,361
2,296
2,525
28,454
Jai Hind
608
604
711
712
670
514
430
480
440
551
513
596
6,829
Astonfield
1,460
1,520
1,863
1,938
1,991
1,641
1,339
1,319
1,274
1,395
1,213
1,328
18,281
Precious
2,055
2,011
2,520
2,432
2,397
2,023
1,599
1,774
1,636
2,201
1,950
2,049
24,648
Solitaire
2,020
1,979
2,476
2,385
2,330
2,005
1,613
1,703
1,657
2,129
1,916
1,996
24,209
Azure Power Khadoda
1,561
1,501
1,799
1,693
1,762
1,498
1,119
1,193
1,157
1,472
1,474
1,560
17,788
Aatash
668
693
852
785
775
662
479
544
535
709
642
716
8,060
Green Infra
1,432
1,440
1,780
1,725
1,659
1,469
1,110
1,110
1,270
1,418
1,306
1,402
17,121
Aravali Infra
593
614
720
657
593
234
186
325
525
410
600
501
5,956
Mono Steel
1,664
1,651
1,878
1,821
1,888
1,588
1,194
1,255
1,295
1,518
1,503
1,627
18,881
Welspun Urja
3,005
2,844
3,490
3,362
3,277
2,938
2,324
2,421
2,710
2,839
2,648
2,857
34,715
Taxus
409
406
482
493
301
251
209
191
365
290
227
308
3,932
Adani Power
4,888
4,732
5,843
5,782
5,656
4,748
3,891
4,091
4,321
4,321
4,009
4,163
56,446
Konark
862
820
970
923
906
813
635
670
691
803
752
841
9,685
Backbone
611
666
899
961
958
890
680
631
667
682
543
605
8,793
ICML
1,294
1,240
1,496
1,362
1,348
1,231
898
1,029
1,038
1,226
1,075
1,228
14,465
Solar Semi
2,630
2,557
3,264
3,232
3,175
2,864
2,107
2,250
2,394
2,695
2,421
2,590
32,179
SunBorne
2,366
2,094
2,371
2,323
2,430
1,918
1,755
1,794
1,886
2,080
2,033
2,339
25,388
Euro
744
681
796
741
755
706
560
550
650
710
670
750
8,313
TATA (Mithapur)
3,689
3,755
4,341
4,338
4,218
3,898
3,172
3,036
3,239
3,591
3,432
3,590
44,299
GHI
1,502
1,435
1,692
1,477
1,327
834
690
774
1,089
1,274
1,267
1,422
14,782
Moser Baer
2,201
2,173
2,646
2,541
2,455
2,003
1,395
1,583
1,928
2,120
1,973
2,146
25,163
Hiraco
3,078
2,945
3,442
3,271
3,157
2,525
1,938
2,112
2,467
2,709
2,597
2,930
33,172
APCA
763
713
865
799
801
663
538
528
606
708
672
752
8,408
Jaydeep Cotton
4
42
0
0
0
70
657
872
832
944
3,421
GIPCL
704
674
794
770
784
661
473
490
482
708
667
722
7,929
Mi My Solar
4,487
4,314
5,307
4,971
4,946
4,313
3,569
3,777
3,683
4,251
4,013
4,339
51,970
EMCO
680
636
827
680
769
681
550
577
529
643
547
645
7,764
Azure Power Dhama
676
658
835
796
787
707
576
612
589
656
630
664
8,186
ESP
706
699
900
879
882
794
637
677
667
759
669
694
8,963
Millenium
1,614
1,569
1,988
1,925
1,946
1,757
1,305
1,342
1,353
1,631
1,488
1,627
19,545
Visual
3,419
3,271
4,024
3,663
3,566
3,044
2,489
2,807
2,887
3,367
3,116
3,384
39,037
Chattel
3,542
3,437
4,175
3,858
3,813
3,357
2,384
2,767
2,908
3,501
3,223
3,636
40,601
Responsive
3,444
3,338
3,920
3,890
3,742
3,184
2,446
2,674
2,750
3,494
3,352
3,594
39,828
Ujjwala
3,282
3,154
4,064
3,834
3,706
3,180
2,426
2,604
2,606
3,334
3,140
3,368
38,698
Louroux
2,630
2,981
4,172
3,746
4,070
3,564
2,813
3,060
3,017
3,548
3,316
3,469
40,386
S J Green
758
741
861
844
833
715
556
616
616
692
685
743
8,661
Waa Solar
1,511
1,474
1,768
1,772
1,756
1,523
1,195
1,311
1,299
1,482
1,435
1,504
18,030
PLG
2,798
3,030
3,443
3,326
3,159
2,634
2,214
2,212
2,361
2,932
2,674
2,899
33,683
Thavar
3,478
3,465
4,258
4,205
4,207
3,579
2,903
3,131
3,121
3,764
3,267
3,458
42,835
Charanka Solar Park
31,063
30,438
36,854
40,657
40,521
35,350
28,697
28,873
30,852
35,471
32,985
35,673
407,434
ACME
1,914
1,970
2,395
2,243
2,169
1,962
1,574
1,699
1,685
2,081
1,770
1,909
23,371
Sunkon
1,511
1,469
1,747
1,695
1,614
1,336
1,026
1,128
1,211
1,443
1,405
1,349
16,933
Total
110,758
108,807
132,374
132,405
130,853
112,481
89,506
93,691
99,141
114,841
106,945
115,441
1,347,242
2015 Generation detail
Generation detail (MW·h )
January
February
March
April
May
June
July
August
September
October
November
December
Total
Lanco
2,616
2,657
2,885
2,794
2,717
2,174
1,524
1,357
1,974
2,150
1,833
2,583
27,264
Jai Hind
605
601
659
634
582
401
356
45
205
449
507
582
5,625
Astonfield
1,330
1,474
1,749
1,762
1,709
1,254
1,062
0
2
145
521
702
11,710
Precious
2,064
2,109
2,325
2,250
2,343
1,827
1,319
1,567
2,005
2,353
1,909
2,092
24,162
Solitaire
2,041
2,067
2,277
2,234
2,306
1,850
1,297
1,624
1,955
2,304
1,886
2,066
23,906
Azure Power Khadoda
1,572
1,522
1,673
1,608
1,713
1,300
954
1,005
1,415
1,517
1,435
1,639
17,352
Aatash
728
723
795
761
777
587
445
489
637
768
669
750
8,129
Green Infra
1,424
1,464
1,649
1,619
1,687
1,234
1,037
1,130
1,324
1,450
1,288
1,384
16,689
Aravali Infra
626
695
701
695
714
495
423
501
551
640
631
684
7,357
Mono Steel
1,710
1,663
1,787
1,747
1,893
1,175
1,090
1,288
1,382
1,562
1,415
1,717
18,430
Welspun Urja
2,902
2,876
3,255
3,181
3,333
2,789
2,148
2,281
2,844
3,173
2,549
2,867
34,198
Taxus
375
466
521
538
578
441
305
261
284
319
274
286
4,646
Adani Power
4,493
4,703
5,287
5,326
5,778
5,007
3,524
4,065
5,079
5,454
4,521
4,860
58,097
Konark
852
832
763
875
930
772
584
631
790
888
749
836
9,501
Backbone
604
670
842
873
1,024
820
577
579
726
755
546
590
8,604
ICML
1,289
1,259
1,374
1,260
1,299
1,141
832
976
1,174
1,329
1,122
1,255
14,309
Solar Semi
2,611
2,653
3,066
2,963
3,219
2,598
1,740
1,937
2,537
2,874
2,299
2,523
31,020
SunBorne
2,327
2,175
2,406
2,264
2,532
2,165
1,505
1,631
1,952
2,363
2,022
2,332
25,672
Euro
760
730
824
754
734
661
480
487
654
795
668
725
8,271
BEL
473
1,438
1,120
1,098
4,129
EPPL
486
1,462
1,148
1,109
4,205
TATA (Mithapur)
3,836
3,753
4,181
4,084
4,297
3,502
2,650
2,842
3,670
3,945
3,302
3,698
43,760
GHI
1,486
1,480
1,611
1,495
1,484
914
809
968
1,164
1,302
1,150
1,311
15,174
Moser Baer
2,196
2,238
2,477
2,383
2,483
1,850
1,543
1,858
2,102
2,206
1,984
2,150
25,471
Hiraco
2,989
2,996
3,213
3,062
3,197
2,317
1,956
2,406
2,715
2,883
2,648
2,949
33,330
APCA
763
751
751
778
770
553
488
556
649
702
596
685
8,042
Jaydeep Cotton
950
939
997
977
1,012
713
590
666
836
934
846
940
10,401
GIPCL
753
699
763
738
758
564
445
452
515
665
619
745
7,715
SSNL
1,070
1,463
1,510
1,517
1,573
1,231
989
1,118
1,228
1,348
1,172
1,269
15,488
Mi My Solar
4,422
4,438
4,856
4,723
4,864
3,681
2,903
2,647
3,794
4,504
3,930
4,360
49,122
EMCO
686
703
754
725
649
488
431
432
637
715
628
683
7,531
Azure Power Dhama
672
691
759
734
753
580
460
492
548
622
553
635
7,499
ESP
716
741
836
830
850
684
523
616
713
793
640
671
8,613
Millenium
1,658
1,659
1,804
1,790
1,914
1,447
1,018
1,256
1,490
1,704
1,442
1,593
18,775
Visual
3,425
3,307
3,712
3,527
3,677
2,775
2,343
2,919
2,778
3,715
3,150
3,513
38,841
Chattel
3,675
3,627
3,965
3,841
3,930
3,088
2,315
2,636
3,217
3,837
3,307
3,661
41,099
Responsive
3,640
3,648
3,966
3,808
3,894
2,956
2,300
2,452
3,228
3,798
3,290
3,676
40,656
Ujjwala
3,428
3,416
3,722
3,602
3,690
2,798
2,210
2,288
3,040
3,558
3,088
3,436
38,276
Louroux
3,619
3,631
4,169
4,152
4,427
3,419
2,821
3,228
3,653
4,026
3,392
3,640
44,176
S J Green
749
743
776
785
799
638
524
626
700
773
682
752
8,548
Waa Solar
1,527
1,546
1,738
1,705
1,744
1,383
1,123
1,341
1,504
1,634
1,391
1,547
18,183
PLG
3,009
3,001
3,215
3,073
3,235
2,593
1,809
1,664
2,592
2,924
2,596
2,901
32,612
Thavar
3,509
3,596
3,959
3,910
4,163
3,241
2,289
2,747
3,557
3,917
3,213
3,558
41,659
Charanka Solar Park
36,718
38,803
49,685
52,802
57,408
46,528
35,050
36,734
47,230
53,248
43,783
45,800
543,789
ACME
1,993
2,023
2,266
2,171
2,229
1,759
1,374
1,635
1,872
2,258
1,960
2,188
23,728
Sunkon
1,450
1,412
1,707
1,461
1,601
1,004
970
1,151
1,333
1,465
1,362
1,521
16,437
Total
119,868
122,643
142,228
142,812
151,267
119,395
91,133
97,583
123,212
141,662
119,838
130,560
1,502,201
2016 Generation detail
Generation detail (MW·h )
January
February
March
April
May
June
July
August
September
October
November
December
Total
Lanco
2,624
2,624
Jai Hind
586
586
Astonfield
759
759
Precious
2,120
2,120
Solitaire
2,087
2,087
Azure Power Khadoda
1,578
1,578
Aatash
741
741
Green Infra
1,461
1,461
Aravali Infra
729
729
Mono Steel
1,726
1,726
Welspun Urja
2,821
2,821
Taxus
325
325
Adani Power
4,912
4,912
Konark
851
851
Backbone
630
630
ICML
1,258
1,258
Solar Semi
2,532
2,532
SunBorne
2,384
2,384
Euro
785
785
BEL
1,154
1,154
EPPL
1,157
1,157
TATA (Mithapur)
3,803
3,803
GHI
1,516
1,516
Moser Baer
2,264
2,264
Hiraco
3,099
3,099
APCA
789
789
Jaydeep Cotton
957
957
GIPCL
739
739
Rallies
671
671
SSNL
1,280
1,280
Mi My Solar
4,527
4,527
EMCO
712
712
Azure Power Dhama
683
683
ESP
747
747
Millenium
1,752
1,752
Visual
3,586
3,586
Chattel
3,771
3,771
Responsive
3,770
3,770
Ujjwala
3,534
3,534
Louroux
3,825
3,825
S J Green
784
784
Waa Solar
1,538
1,538
PLG
3,051
3,051
Thavar
3,637
3,637
Charanka Solar Park
51,249
51,249
ACME
2,255
2,255
Sunkon
1,561
1,561
Total
139,320
139,320
Project list
Project List
Developer
Location
Size (MWp )
Commissioned
Notes
Aatash Power Pvt Ltd
5
Abellon Cleanenergy Limited
Sabarkantha[ 41]
3
2012-03
EPCM by Waaree Energies Private Limited
ACME Tele power Ltd
Anand[ 42]
15
2012-03
Adani Power Ltd
Kutch[ 43]
40
2012-01-05
Netra substation
AES Solar Energy Gujarat Pvt Ltd
Charanka (Patan)
15
Alex Astral Power Pvt Ltd
Charanka (Patan)[ 44]
25
Ambit Advisory Services Pvt Ltd
5
APCA Power Private Limited
Dhank (Rajkot)[ 45]
5
Aravali Infrapower Limited
Dhank (Rajkot)[ 30]
5
2012-02
Astonfield Renewable Resources
(Patan)[ 46]
12.3
Avatar Solar
5
thin film[ 47]
Azure Power (Gujarat) Pvt Ltd
Dhama (Surendranagar)[ 44]
5
2011
Azure Power (Haryana) Pvt Ltd
Khadoda (Sabarkantha)[ 44]
10
2011-10
5 MW June 2011
Backbone Enterprises Limited
Shiv Lakhashin Kachchh[ 48]
5
2012-01
Cargo Motors (Tata) [ 49]
Mithapur (Jamnagar)
25
2012-01-25
Claris LifeScience Ltd
Ahmedabad[ 50]
2
Common Wealth Business Technologies
10
Corner Stone Energy Pvt Ltd
Charanka (Patan)[ 51]
5
Driesatz My Solar
15
EI Technologies Pvt. Ltd
Charanka (Patan)[ 44]
1
Emami Cement Limited
Charanka (Patan)[ 44]
10
EMCO Limited
Surendranagar[ 52]
5
ESP Urja
Surendranagar[ 53]
5
Essar Power Limited
Bhuj (Kutch)[ 54]
1
2012-02
Euro Solar Private Ltd
5
(CPEC Ltd. )
Ganeshvani Merchandise Private Limited
(Rajkot)
5
Ganges Green Energy Private Limited
Rajkot[ 55]
25
GHI Energy Private Limited
Porbandar[ 56]
10
2012-01
constructed by Lanco[ 57]
GMR Gujarat Solar Power Pvt. Ltd
Charanka (Patan)[ 44]
25
Green Infra Solar Energy Limited
Mervadar (Rajkot)[ 44]
10
2011-11
GSPC Pipavav Power Company Limited
Charanka (Patan)[ 44]
5
constructed by Lanco[ 57]
Gujarat Industries Power Company Limited
Vastan (Surat)[ 58]
5
2012-02
Gujarat Mineral Development Corporation Limited
Panandhro (Kutch)[ 59]
5
Gujarat Power Corporation Limited
Charanka (Patan)[ 44]
5
constructed by Lanco[ 57]
Harsha Engineers Limited
Khanpur (Ahmedabad)
1
2012-03
Hiraco Renewable Energy Pvt Ltd
(Porbandar)[ 60]
20
India Solar Ray Power Private Limited
(Kutch)[ 61]
10
Industrial Power Infrastructure Limited
(Jamnagar)[ 62]
25
Inspira Solar (Palace)
Ambaliyara[ 44]
15
Integrated Coal Mining Limited
(Kutch)[ 63]
9
2012-03
Jaihind Projects Limited
Radhanpur (Patan)[ 64]
5
2012-03-03
Kemrock Industries and Exports Limited
(Vadodara)[ 65]
10
Kiran Energy Solar Power Private Limited
Charanka (Patan)[ 44]
20
Konark Gujarat PV Pvt. Limited
(Kutch)[ 66]
5
2012-01
Lanco Infratech Ltd
Bhadrada (Patan)[ 44]
5
2010-12
area - 27 acres[ 67]
Lanco Infratech Ltd
Chadiyana (Patan)[ 44]
15
2011
Lanco Infratech Ltd
Charanka (Patan)[ 44]
15
5 MW January 2011
Louroux Bio Energies Limited[ 68]
Dheduki (Surendranagar)[ 69] [ 70]
25
2012-02
MBH Power Private Limited
Chitra (Bharuch)[ 71]
1
2012-01
Mi My Solar
Surendranagar
15
Millenium Synergy (Gujarat) Private Limited
(Surendranagar)[ 72]
10
Monnet Ispat & Energy Limited
25
Mono Steel (India) Ltd.
Una (Junagadh)[ 73]
10
2012-04-12
EPCM by Waaree Energies Private Limited
Moser Baer Energy & Development Ltd
(Porbandar)[ 74]
15
NKG Infrastructure Limited
Charanka (Patan)[ 44]
10
PLG Power Ltd
(Patan)[ 75]
40
2012-01
20 MW completed
Precious Energy Services Pvt Ltd
Dalpatpura (Banaskantha)[ 44]
15
2011-10
Moser Baer
Rajesh Power Services Private Limited
Patdi (Surendranagar)
1
2012-02
Rasna Marketing Services LLP
Patdi {Surendranagar}[ 76]
1
2012-01
Responsive Sutip Limited
(Surendranagar)[ 77]
25
Roha Energy Private Limited
Charanka (Patan)[ 44]
25
S J Green Park Energy Private Limited
Shivlakha (Kutch)[ 78]
5
23°23′05″N 70°36′01″E / 23.38472°N 70.60028°E / 23.38472; 70.60028 (CPEC Ltd. )
Sand Land Real Estates Pvt Ltd
(Banaskantha)[ 79]
25
Saumya Construction Pvt Ltd
2
Solar Semiconductor Pvt Ltd
(Kutch)
20
Solitaire Energies Pvt Ltd
Dalpatpura (Banaskantha)[ 44]
15
2011-10
Moser Baer
Som Shiva Impex Limited
(Surendranagar)[ 80]
1
Sun Edison Energy India Private Limited
Charanka (Patan)[ 81]
25
2012-04-19[ 82]
89,000 modules
SunBorne Energy[ 83]
Karmaria (Rajkot)[ 84]
15
2011-12-31
Suntech panels
SunClean Renewable Power Pvt. Ltd.
Charanka (Patan)[ 44]
25
Sunkon Energy Pvt Ltd
(Surendranagar)
10
Surana Telecom & Power Limited
Charanka (Patan)[ 44]
5
Tatith Energy
5
SolarWorld panels
Taxus infrastructure & Power Project Pvt Ltd
Raparkhokhara (Kutch)
5
Toss Financial Services Pvt Ltd
2
Ujjawala Power Pvt Ltd
(Surendranagar)[ 85]
25
Unity Power Pvt Ltd
5
Universal Solar System
Charanka (Patan)[ 44]
2
2012-01
Visual Percept Solar Projects Private Limited
(Surendranagar)[ 86]
25
WAA Solar Pvt Ltd
(Surendranagar)[ 44]
10
2012-03
Welspun Urja India Limited
Khirsara (Kutch)[ 44]
15
2011-11
Yantra eSolarIndia Private Limited
(Patan)[ 87]
5
Zeba Solar Gujarat Pvt Ltd
(Vadodara)[ 88]
10
ZF Steering Gear (India) Limited
Charanka (Patan)[ 44]
5
Total
968.5
Source: GEDA[ 89]
Gujarat Solar Park-1
This section needs to be updated . Please help update this article to reflect recent events or newly available information. (December 2020 )
Gujarat solar park 1 , also called Charanka Solar Park, is being built on a 2,000-hectare (4,900-acre) plot of land near Charanka village in Patan district , northern Gujarat. So far, the park has witnessed investments of Rs 5,365 crore and generated 3,441 million units till date.
Installed generation capacity is at about 615 MW at present, having been commissioned by 31 developers in the Solar Park. GACL (Gujarat Alkalies and Chemicals Limited) is setting up 30 MW Solar PV plant, and GNFC (Gujarat Narmada Valley Fertilizers and Chemicals) is in the process of setting up 10 MW project.
The Gujarat Power Corporation Limited (GPCL), the project's developer, said in April 2018 that further capacity addition of 150 MW taking the total to 790 MW may be opted for soon given the availability of land in the Park.[ 90]
Projects of 95MW are under construction and 30MW under planning as of December 2018.[ 91]
See also
References
^ Ramesh, M. (16 June 2024). "Gujarat plans ₹96,000 crore transmission infrastructure push" . www.thehindubusinessline.com . Retrieved 17 June 2024 .
^ a b "Gujarat's Total Renewable Energy Installed Capacity stands at 19,415 MW" . DeshGujarat . 20 July 2022. Retrieved 18 September 2022 .
^ "Gujarat riding on the suns chariot" . Times of India . 2 December 2018. Retrieved 25 January 2019 .
^ Dave, Kapil; Damor, Kalpesh (7 July 2021). "Green leap: Gujarat set for 3-fold RE surge" . The Times of India . Retrieved 21 September 2021 .
^ Balachandar, G. (19 April 2022). "Renewable capacity addition: Rajasthan and Gujarat pip Tamil Nadu and Karnataka" . The Hindu Businessline . Retrieved 30 May 2022 . (subscription required)
^ "Top 5 States In Rooftop Solar In India - Saur Energy International" . www.saurenergy.com . Retrieved 17 June 2024 .
^ "Gujarat is progressing towards its solar PV rooftop target 2021-22" . pv magazine India . 22 April 2021. Retrieved 4 December 2021 .
^ Gujarat Solar Power Plants
^ Solar PV Plants Commissioned in Gujarat
^ Solar power project in Gujarat, India
^ a b Solar power plant in Ahmedabad Asia's biggest
^ a b Moser Baer Clean Energy Limited commissions largest solar power capacity
^ a b Gunthawada, India
^ a b 15MWp Solar PV Power Project in Village Gunthavada (Dalpatpura), Taluk Kankarej, District-Banaskantha, Gujarat State, India
^ a b PDD
^ Moser Baer commissions 30-MW solar farm in Gujarat
^ PDD
^ Adani Power to invest Rs 3,000 cr in solar power
^ PDD
^ Adani Group commissions largest solar power project
^ Adani commissions Rs 400 cr 40 mw solar unit in Gujarat
^ PDD
^ PDD
^ PDD
^ PDD
^ PDD
^ PDD Chadiyana
^ GHI PDD
^ Hiraco PDD
^ a b PDD
^ PDD
^ PDD
^ PDD
^ Operational Projects
^ Solar PV Power Project by MMPL in Fatepur, Gujarat
^ Surendranagar Solar Farm
^ Installed Capacity
^ Solar Park Day 1 Highlights
^ Installed Capacity
^ Energy Account Archived 8 June 2012 at the Wayback Machine
^ New Solar Project by Abellon Clean Energy Ltd
^ New Solar Project by Acme Solar Technologies (Gujarat) Pvt. Ltd
^ Adani Group commissions 40mw solar power plant in Gujarat
^ a b c d e f g h i j k l m n o p q r s t u v w x PV India Map
^ PDD
^ Project Portfolio
^ Avatar Solar Receives 5 MW Indian Project Contract
^ Solar Power (shiv Lakhash) by Backbone Enterprises Ltd
^ Tata Power commissions 25 MW solar project in Gujarat
^ New Solar Project by Claris Lifesciences Ltd
^ Proposal for construction
^ New Solar Power Project by Emco Ltd
^ New Solar Project by Esp Urja Pvt Ltd
^ Essar Power commissions 1MW solar photovoltaic plant in Bhuj
^ New Solar Power Project by Ganges Green Energy Pvt Ltd
^ New Solar Project by Ghi Energy Pvt. Ltd
^ a b c Lanco Infra completes 56 MW grid connected solar photovoltaic power plants in Gujarat
^ Dedication of 5 MW Solar Power Plant to the Nation
^ GMDC to set up 5MW solar plant
^ New Solar Project by Hiraco Renewable Energy Pvt Ltd
^ New Solar Project by India Solar Ray Power Pvt Ltd
^ New Solar Power Project by Industrial Power Infrastructure Ltd
^ New Solar Project by Integrated Coal Mining Ltd
^ Project Overview
^ New Solar Project by Kemrock Renewable Energy Ltd
^ New Solar Project by Konark Gujarat Pv Pvt Ltd
^ Towards 25 years of carbon-free power
^ PDD
^ Martifer Solar, Louroux Bio Energies to collaborate on 25MW of solar projects in Gujarat, India
^ Solar Photovoltaic Power Project by Louroux Bio Energies Ltd
^ Electricity Projects
^ New Solar Project by Millenium Synergy Gujarat Pvt Ltd
^ Solar Power (una) by Mono Steel India Ltd
^ New Solar Project by Moser Baer Energy And Development Ltd
^ New Solar Power Project by Plg Photovoltaic Ltd
^ Solar Power (patdi) by Rasna Marketing Services LLP
^ New Solar Power Project by Responsive Sutip Ltd
^ Our Projects
^ New Solar Project by Sandland Real Estates Pvt Ltd
^ New Solar Project by Som Shiva (Impex) Ltd
^ SunEdison Announces Activation of 25MW Solar Power Plant in Asia’s Largest Solar Park in Gujarat, India
^ 25MW Solar Plant Opens in Asia's Largest Solar Park
^ SunBorne Energy pools funds for Gujarat solar plant
^ SunBorne Energy achieves financial closure for 15-MW solar plant
^ New Solar Power Project by Ujjawala Power Pvt Ltd
^ New Solar Project by Visual Percept Solar Projects Pvt Ltd
^ New Solar Power Project by Yantra E Solar India Pvt Ltd
^ New Solar Project by Zeba Solar North Pvt Ltd
^ Details of Solar Power Project Project Developers
^ "Solar power capacity at Charanka Solar Park to touch 790 MW" . DNA . 21 April 2018. Retrieved 25 January 2019 .
^ "Gujarat riding on the suns chariot" . Times of India . 2 December 2018. Retrieved 25 January 2019 .
External links