Stormy Rivulet, Abandon Brook, Mueller River, Precedent Creek, Question Creek, All-Up Creek, Foregone Creek, Stout Creek
• right
Cramp Creek, Shiver Creek, Accident Creek, Io or Ossify Creek, Adieu Creek, Taken -a- Back Creek, Ease Down Creek, Dribble Creek, Gagliardi Creek, Stout Creek, Collyer Creek
The Haast area is not connected to the national electricity grid. New Zealand Energy operates an electricity distribution network supplying the town. Electricity is generated by an 800-kilowatt hydroelectric scheme on the Turnbull River, constructed in 1972. The scheme is backed up by a 375-kilowatt diesel generator.[1] In 2023, the company applied for consent to build a second hydro power station on the Turnbull River.[2]