In October 2011, the third meeting of the Standing Committee of the Municipal People's Congress of Nantong City launched the "Nantong Urban Rail Transit Planning Work" plan. In April 2012, the Nantong Rail Transit plan was released and circulated online.
On 19 August 2014, Nantong's urban rail rapid transit construction plan was approved by the National Development and Reform Commission,[2][3] becoming the sixth in Jiangsu and the 37th city in mainland China approved for rapid transit.[4]
Line 1's construction began on 18 December 2017,[5] and opened on 10 November 2022.[1] Line 1 begins at Pingchao Station (平潮站) and ends at Zhenxing Lu Station (振兴路站). The line is 39.182 kilometres (24.3 mi) long, with 28 underground stations.[6]
Line 2
Construction for Line 2 began on 26 October 2018. Line 2 is 20.85 km long, with 17 stations. It is opened in 27 December 2023.[7]
Long-term planning
In long-term, Nantong Rail Transit will consist of 4 rapid transit lines with a total length of 170.8 kilometres (106.1 mi) and several commuter rail lines totaling 153.2 kilometres (95.2 mi).
^ ab迈入地铁时代 引领城市转型. 南通市人民政府 (in Chinese). 2018-01-04. Archived from the original on 2019-12-12. Retrieved 2019-12-12. 2014年8月,国家发改委批复《南通市城市轨道交通近期建设规划(2014-2020年)》
^ ab南通市城市轨道交通近期建设规划(2014~2020年)(PDF) (in Chinese). Archived(PDF) from the original on 2019-12-12. Retrieved 2019-12-12 – via cnmn.com.cn. 近期建设方案 建设1号线一期工程和2号线一期工程
^南通轨道交通1号线开工建设 一期设28座站点 [Nantong Metro Line 1 construction begins, including 28 subway stations]. 人民网 (in Chinese). 18 December 2017. Archived from the original on 23 December 2017. Retrieved 23 December 2017.