Changzhou Metro
The Changzhou Metro is a rapid transit system in Changzhou, Jiangsu province, China. The system started operation on 21 September 2019, with the opening of its first line, Line 1 becoming the 35th city in China with a subway in Mainland China.[1] The Changzhou metro currently has Line 1 and Line 2 in operation, while Line 5[2] and Line 6 is under construction. Announcements are made in Mandarin and English. Lines in operation
Line 1Line 1 started operation on 21 September 2019.[1] Construction for Line 1 began on 28 October 2014. The first phase runs from Forest Park (森林公园) in the north to Nanxiashu (南夏墅) in the south. It is 34.24 kilometres (21.28 mi)[3] in length with 29 stations, including 27 underground and 2 elevated. The line will be extended North for 3.5 km and South for 3.2 km.[5] In its first year of operation, the highest passenger flow in a single day was 243,000 on October 2 and total ridership in 2019 was 10.3 million.[6] Line 2Construction for Line 2 began on 13 February 2017.[7] It is 19.79 kilometres (12.30 mi)[4][7] in length with 15 stations, from Qingfeng Park to Wuyi Lu.[7] It was opened on 28 June 2021.[4] Future expansionShort term plan
Construction of a two-station pilot section for Line 5 at the Lanyuewan terminal commenced in October 2023. The full-scale construction of Line 5 is scheduled to begin in 2024, with an anticipated completion date set for 2028.[8] Long term planAccording to the "Changzhou Urban Rail Transit Construction Plan (2011~2018)", the urban rail transit network of Changzhou City is planned to consist of 6 lines by 2050.[11]
FaresThe Changzhou Metro system operates with a base fare of 2 yuan, covering the initial 5 kilometers, and subsequent price increments at intervals of 5, 7 and 9 kilometers, with each step adding 1 yuan to the fare. Specifically, fares are structured as follows: 2 yuan for journeys up to 5 kilometers, 3 yuan for trips spanning 5-10 kilometers, 4 yuan for distances of 10-15 kilometers, 5 yuan for 15-22 kilometers, 6 yuan for 22-29 kilometers, and a progressive increase of 1 yuan for every additional 9 kilometers beyond 29 kilometers.[12] TrainsTrains for the first phase were manufactured by CRRC Nanjing Puzhen. Changzhou Rail Transit Line 1 operates Type B cars, with each train consisting of 6 cars - 4 motor cars and 2 trailer cars. The first phase of the project involved the procurement of 36 trainsets. A 6-car set spans approximately 120 meters (393 ft 8 in) in length and is 2.9 meters (9 ft 6 in) wide, capable of reaching a maximum operating speed of 80 km/h (50 mph). Each car features 4 pairs of 1.3 meters (4 ft 3 in) wide doors on both sides, accommodating up to 2062 passengers. The trains are constructed using lightweight aluminum alloy material, designed for a service life of 30 years.[13] Network map
References
|